Sl. No. | Description | Eligible Tender Value-Crore | |||
---|---|---|---|---|---|
1 | Design Engineering,Supply of all types of items for Storage tank in Oil /Petroleum /Aluminium/Steel/Power Industries | 60-80 | |||
2 | Design, Engineering, Supply of Pot Shell,Super structure,Bus bar especially in Aluminium smelter Plant. | 20-25 | |||
3 | Design, Engineering, manufacturing,Supply of Fire alarm system , fire fighting system for Oil industries | 10-12 | |||
4 | Design, Engineering, Supply of Electrical & instrumentation works for Oil, Steel, power, aluminium sectors. | 5-8 | |||
5 | Design, Engineering,Supply of Roof Drain for Oil industries. | 4.00 | |||
6 | Design, Engineering, manufacturing, Supply of Rim Seal system for Oil Industries | 7.00 | |||
7 | Design, Engineering, manufacturing, Supply of Primary and Secondary Mechanical Seal for Oil Industries | 3.5 | |||
8 | Design, Engineering, Supply of All types of Carbon Steel Pipes, Gauge well for all industries | 7.00 | |||
9 | Supply of Paints for All Industries | 8-10 | |||
10 | Design, Engineering, manufacturing, Supply of valves, Pipes, Bends, Reducers, Flanges, Gasket, Nut & Bolts, Insulation material, heat tracing for all types of Industries | 12-15 | |||
11 | Design, Engineering,Supply electrical cables,pressure gauge,Dip scale,Level transmiter,Temperature Transmitter for all Industries. | 5.00 | |||
12 | Design, Engineering, Supply of Structues for all industries | 12-15 |
SL. No. | Description | EligibleTender Value-Crore | |||
---|---|---|---|---|---|
1 | Design Engineering, fabrication,erection testing & commissioning of Storage tank on EPC contract for Oil /Petroleum /Aluminium/Steel/Power Industries | 60-80 | |||
2 | Design Engineering, fabrication, erection testing & commissioning of Civil/structural/Piping/Painting of all composite works for all types of industries. | 35-50 | |||
3 | Design, Engineering, fabrication, testing & commissioning of all types of Industrial equipment, Structural works for tanks/structural buildings/steel plant/aluminium plant/power plant | 6.00 | |||
4 | Painting works in structure, tanks, piping for oil/steel/aluminium/power industries | 10-12 | |||
5 | Design, Engineering, Testing & commissioning of Fire alarm system, fire fighting system for Oil industries | 10-12 | |||
6 | Design, Engineering, installation, testing & commissioning of Electrical, instrumentation and electronics items for Oil, steel, power, aluminium sector | 5-8 | |||
7 | Composite works: Civil/ Mechanical/ Structural/ Electrical/ Instrumentation/Piping works for all industries. | 10-15 | |||
8 | Design, Engineering, installation, Testing & Commissioning of Roof Drain for Oil industries. | 4.00 | |||
9 | Design, Engineering, installation, Testing & Commissioning of Rim Seal system for Oil Industries | 7.00 | |||
10 | Design, Engineering, installation, Testing & Commissioning of Primary and Secondary Mechanical Seal system for Oil industries | 3.5 | |||
11 | Design, Engineering, Fabrication, Erection, Testing & commissioning of Underground and above ground pipes for all industries. | 7.00 | |||
12 | Design, Engineering, Testing & Commissioning of Instrumentations like, pressure gauge, control panel,temperture transmiter, flow level meter, dip scale, for all industries. | 2-3 | |||
13 | Design, Engineering, Testing & Commissioning of Electrical items like, control panel, electrical sub station,transformer,all types of cable for all industries. | 2-3 | |||
14 | Design, Engineering, fixing, Testing & Commissioning of heat treacing system for Pipe & tanks in oil industries. | 2-3 | |||
15 | Erection, Instalation, Testing & Commissioning of Industrial Equipment in aluminium, steel, oil, power sector | 4-8 | |||
16 | Design, Engineering, Fabrication and Erection of Structural works in Oil/Steel/power/alluminium sectors | 30-50 | |||
17 | Design, Engineering, Installation, Testing & Commisioning of all types of valves,flanges, gasket, pumps for Oil/Aluminium/steel/power Industries. | 3.00 | |||
18 | Detail Engineering drawing, Fabrication, Erection, installation, of Bus bar for Aluminium smelter plants. | 60.00 | |||
19 | Detail Engineering drawing,Fabrication, Erection,installation of Super structure for Aluminium smelter plants | 15-20 | |||
20 | Detail Engineering drawing,Fabrication, Erection,installation of Pot Shell for Aluminium smelter plant | 15-20 | |||
21 | Design, Engineering,installation of insulation for tanks & pipe line for all industries. | 5-7 | |||
22 | Installation,Testing & Commissioning of PTM,FTA in aluminium industries | 10.00 | |||
23 | Skilled & unskilled Manpower supply in all types of Industries. | 10.00 |
Pre-project